Answer five questions about your space, power, and cooling. Everything runs in your browser and nothing is saved. These are planning-level figures from the same estimator Perimeter Compute's engineering team uses to size an Inference Hub, not an offer.
Deployable capacity is governed by the shortest bar: -
This is a planning-level screen from Perimeter Compute's own Inference Hub estimator, not an offer, quote, or commitment. The dollar figures include percentage rent, condenser-water tonnage charges, submetering fees, recovered waste heat, and demand-response value, all at today's placeholder rates. Every number here still needs site verification and engineering review before it's real. On the capacity side, we assume 3-phase service at 0.95 power factor, continuous-load sizing, a power usage effectiveness of 1.15, and roughly 0.28 tons and 0.48 SF of program area for every IT kW.
We look forward to building the future of metro-edge compute with you.